Abbreviations

Classified in Other subjects

Written at on English with a size of 3.56 KB.

 

AC Actual Cost / Cost Real ACWP Actual Cost of Work Performed / Real Cost of Work Done BAC Budget at Completion / Budget until the Conclusion BCWP Budgeted Cost of Work Performed / Budgeted Cost of Work Performed BCWS Budgeted Cost of Work Scheduled / Budgeted Cost of Work Planned CCB Change Control Board / Committee Change Control COQ Cost of Quality / Cost of Quality CPAF Cost Plus Award Fee / Cost More Fees CPF Compliance Objectives Cost-Plus-Fee / cost plus fee CPFF Cost-Plus-Fixed - Fee / Cost More Fixed Fee CPI Cost Performance Index / Cost Performance Index CPIF Cost-Plus-Incentive-Fee / cost plus fee with incentives CPM Critical Path Method / Critical Path Method CV Cost Variance / Variation of Cost Estimate at EAC Completion / Estimation Conclusion EF Early Finish Date / Early Termination Date EMV Expected Monetary Value / Expected Monetary Value ES Early Start Date / Early Start Date ETC Estimate to Complete / Completion Estimate to Earned Value EV / EVM Earned Value Earned Value Management / Earned Value Management FF-to-Finish Finish / End to End FFP Firm-Fixed-Price / Fixed Rate Closed FMEA Failure Mode and Effect Analysis / Analysis of Failure Modes and Effects FP-EPA Fixed Price with Economic Price Adjustment / Fixed Price with Economic Price Adjustment FPIF Fixed-Price-Incentive-Fee / Fixed Price with Incentive Fees FS More Finish-to-Start / End to Start IFB Invitation for Bid / Invitation to Bid LF Late Finish date / Date of Completion Delayed LOE Level of Effort / Level of Effort LS Late Start Date / Start Date Delayed OBS Organizational Breakdown Structure / Structure of the Organization Breakdown PDM Precedence Diagramming Method / Method Precedence Diagramming by PMBOK ® Project Management Body of Knowledge / Basis for Management Projects PMIS Project Management Information System / Information System Project Management PMP ® Project Management Professional / Professional Project Management Planned PV Value / Planned Value Quality Assurance QA / QC Quality Assurance Quality Control / Quality Assurance Responsible RACI, Accountable, Consult, And Inform / Responsible Officer, consult and inform RAM Responsibility Assignment Matrix / Matrix RBS Responsibilities Assigned Risk Breakdown Structure / Risk Breakdown Structure RFI Request For Information / Request for Information RFP Request for Proposal / Request for Proposal RFQ Request for Quotation / Request for Quotation SF Start-to-Finish / Start to Final SOW Statement of Work / Statement of Work Schedule Performance Index SPI / Schedule Performance Index SS Start-to-Start / Home to Home SV Schedule Variance / Variation of Schedule SWOT Strengths, Weaknesses, Opportunities, and Threats / Weaknesses, Threats, Strengths and Opportunities (SWOT) T & M Time and Material / Time and Materials Total Quality Management TQM / Total Quality Management Work Breakdown Structure WBS / Breakdown Structure Labor (EDT)

Entradas relacionadas: